Click to View Takoma to Sligo Rock Excavation, Manholes & other Tasks performed

77,000lb MH section Set inside Takoma Substation. Several High Voltage Electric Lines in the Vicinity
MD Rt. 29 Sound Shed to reduce rock excavation noise for surrounding residents

4 -way Feeder transition to 90 degree Terminations of each Phase A, B, C, & Spare.
Riser sections of A, B, C, & Spare conduits
An innovative set-up with quick attachment applications for rock removal featuring a Rock Wheel, Hydraulic Hammer, & a bucket outfitted with Rock Teeth powered by a Hitachi 180 44,000lb Machine
Removing Hydraulic Hammer with Quick attach & attaching Rockwheel application.